SEMEN TANK MAINTENANCE
SEMEN TANK MAINTENANCE
Checklist for Optimal Semen Storage & Viability
WEEKLY
- Measure & record LN₂ level (maintain ≥4 inches / 10 cm or per tank specs)
- Log readings to monitor evaporation trends
- Visual inspection: exterior for frost, dents, cracks, or damage
- Check neck plug/cork for tight fit, wear, or frost — replace if needed
- Keep canisters/straws below frost line; remove only one cane at a time
- Ensure tank is stable, elevated, in clean/dry/ventilated area
MONTHLY
- Clean exterior with mild soap & water; dry completely
- Review LN₂ logs for abnormal evaporation patterns
- Inspect canisters, handles, and plug for damage
- Verify semen inventory labels and organization
- Check storage environment (dry, elevated, away from sunlight/traffic)
- Confirm PPE and safety/ventilation equipment ready
YEARLY
- Full review of LN₂ logs and tank performance trends
- Complete semen inventory audit (use FIFO rotation)
- Replace neck plug/cork if worn
- Professional inspection of vacuum integrity & holding time
- Update emergency procedures, staff training, and backup plans
Critical Reminders
• Refill LN₂ every 6–8 weeks (or per usage) — never let level drop below 2 inches
• Transfer semen immediately if tank failure suspected
• Handle tank gently — avoid bumps, concrete floors, or excessive movement
• Excellent ventilation required for LN₂ safety
• Always follow your specific tank manufacturer’s guidelines
• Refill LN₂ every 6–8 weeks (or per usage) — never let level drop below 2 inches
• Transfer semen immediately if tank failure suspected
• Handle tank gently — avoid bumps, concrete floors, or excessive movement
• Excellent ventilation required for LN₂ safety
• Always follow your specific tank manufacturer’s guidelines